Master Bathroom Remodel – Day 3

I sometimes wonder why it costs so much to remodel a bathroom when it seems like things go quickly and doesn’t appear to take much time.

On day 3 of the remodel, the electrician arrived. We had them put three outlets where the large mirror used to be so that, instead of one large mirror, we could have three sconces and two mirrors. We thought that would look nice.

Preparing the Wall for the Sconces
Preparing the Wall for the Sconces

We also had the socket installed for the radiant heat that we’re putting in under the floor tile.

Radiant Heat Socket
Radiant Heat Socket (Top)

The electricians were here a little more than a half a day as we also had them prepare for new LED lights on the ceiling.

Next the area was covered where the old soffit was.  We originally thought that the soffit that ran along the wall could also be replaced but we found out it’s an actual beam so it had to stay there.

Soffit Replacement
Soffit Replacement

And look what was installed on day 3 ~ the Kohler bubble bathtub. Can’t wait to get in this!

Kohler Bathtub Installed
Kohler Bathtub Installed

The previous owner two exhaust fans in this bathroom.  One was an exhaust over the toilet and the other was a heat lamp with an exhaust in the middle of the room.

We decided to remove the exhaust over the toilet and have a large quieter one installed in the middle of the room.

Exhaust Removal
Exhaust Removal

So far, everything is stress-less.  Well, okay, everything except my husband.  (laughing)